Fort Vale

fortvale

The scheme involved the construction of a new two storey centralised office accommodation building immediately adjacent to the main production building.

The two buildings are linked via a new two storey circular entrance structure, which incorporates bow string steel trusses to a fully glazed roof overhead of a feature entrance staircase to the first floor offices.

A new full height glazed frontage was also constructed to the gable end of the production building to match through the facades of both the new and old buildings.

The new buildings are steelwork framed and are supported on piled foundations.

First Choice Homes


The new offices occupy a previously developed site. A mix of fills and old foundations led to the development of a piled solution. firstchoice Read More

Newcastle Business School

The Practice has a long and successful working relationship with the developer of this site and the latest project is an eleven storey office block. newscastleuni Read More

Stoke Bus Station


The Alan Johnston Partnership were employed by Vinci Construction UK to complete the civil & structural design for the Stoke bus station. stokebusstation Read More

The Hive Manchester


A six storey office block, built in the heart of Manchesterís Northern Quarter by the Argent Group PLC.

thehive Read More

Our Address

4th Floor
1 Dale Street
Liverpool
England
L2 2ET

Contact Us

E: mail@ajpstructeng.com
P: +44 (0)151 227 1462
F: +44 (0)151 255 1187
H: Mon to Fri 8:30 to 17:00

Company

Alan Johnston Partnership LLP is a Limited Liability Partnership registered in England and Wales, Number OC394381.

Find Us

map
Подвесные потолки